Skip to content

WBI-Print 15

Excavation pit for the Uelzen II lock – DSV vault anchored at the rear

– Overall planning
– Static verifications
– Quality assurance
– Special features
– Ballasting

This publication is only available in German.

SKU: WBI-Print 15 Category:

From the content:

  • Excavation pit for Uelzen II lock
  • Description of the construction project
  • Back-anchored, arched excavation base constructed using the jet grouting method (DSV)
  • Static structural and “pseudo-spatial” calculations using the FE method
  • Computer-aided quality assurance
  • Pumping tests to check the impermeability
  • Specialist supervision
  • Special features of the DSV elements
  • Ballasting of a water ingress and remediation without flooding
Datum

23.06.2022